Maintain, integrate or rebuild?

← Legacy systems

Rebuilding is rarely the first choice. A system that has run for years holds business rules written down nowhere else, and you do not buy those back in an off-the-shelf package. First see whether maintenance suffices, then whether an integration solves the bottleneck, and only then consider rebuilding.

Updated on 28 August 2026

The three routes

Maintain
Fixing faults, small extensions, having someone to call again. The cheapest route and often enough while the system does what it should.
Integrate
The system stays but starts talking to the rest. This usually solves the real bottleneck: data that is stuck.
Rebuild
Only worthwhile when requirements have genuinely changed or the platform really cannot be maintained. Expect to rediscover rules nobody remembers.

Five questions that decide it

How many business rules are in there?
The more unwritten logic, the more expensive a rebuild. This is by far the heaviest factor.
Who can still get in?
If nobody has the knowledge any more, taking over the code is the first step whichever route you choose afterwards.
Can the system be integrated?
A system with an interface or a readable database rarely needs replacing.
How critical is it?
An application the whole operation runs on is not replaced in one go but step by step.
What prompted the question?
A supplier shutting down calls for something different than a functional wish. Name that first.

In practice it is often a combination: maintenance first to get breathing room, then an integration for the biggest bottleneck, and only after that a gradual replacement if needed.

More on this →

Question not covered here?

Describe briefly what it is about and we will tell you what is possible.